Abstract
Construction monitoring turns field records into evidence for decisions on time, productivity and quality. This descriptive case study assessed technical control and construction progress of the Gastronomic Corridor on the Puerto Cayo boardwalk, Ecuador. All available daily reports (No. 1 to 29, May to July 2026) were analysed and triangulated with the progress matrix, the Gantt schedule and the batching sheets. Reported progress was 100% for preliminary works, 80% for earthmoving and 40% for walls and for the commercial module structure. Wall pours reached 1.60-2.40 m³/h with a specified f'c of 210 kg/cm². Two volumetric mix proportions without a mix design were found, together with a schedule that exceeds the 180-day duration. Daily reports support production control, but they cannot demonstrate conformity or durability in a coastal environment unless they are linked to test results and a schedule baseline.
References
American Concrete Institute. (2019). Building code requirements for structural concrete (ACI 318-19) and commentary (ACI 318R-19).
Araya, F. (2021). The influence of changes in construction productivity: A state of the art review. Revista Ingeniería de Construcción, 36(3), 268–274. https://doi.org/10.7764/ric00001.21
ASTM International. (2021). Standard test method for compressive strength of cylindrical concrete specimens (ASTM C39/C39M-21). https://store.astm.org/c0039_c0039m-21.html
ASTM International. (2024). Standard practice for making and curing concrete test specimens in the field (ASTM C31/C31M-24). https://n9.cl/n3c25
Berenguer, R., Passos, A., Monteiro, E. C. B., Helene, P., Just, Â., Oliveira, R., Medeiros, M., & Carneiro, A. (2018). Verifying chloride penetration in concrete test samples partially immersed in seawater in Recife, Pernambuco. Revista ALCONPAT, 8(2), 108–122. https://doi.org/10.21041/ra.v8i2.195
Cai, Y., & Liu, Q.-F. (2023). Stability of fresh concrete and its effect on late-age durability of reinforced concrete: An overview. Journal of Building Engineering, 79. https://doi.org/10.1016/j.jobe.2023.107701
Castro Carrera, F. F., Castro Merino, E. P., Osorio López, J. C., & Merizalde Aguirre, J. E. (2022). Causas de retraso en la construcción de proyectos de agua potable y alcantarillado en Ecuador. Gaceta Técnica, 23(1), 3–19. https://doi.org/10.51372/gacetatecnica231.2
Ccama-Condori, H. A., & Panca-Humpiri, L. V. (2024). Estrategias de mejora del desempeño del cronograma en proyectos de construcción. Novasinergia, 7(2), 164–182. https://doi.org/10.37135/ns.01.14.10
Ding, Y., Ma, J., & Luo, X. (2022). Applications of natural language processing in construction. Automation in Construction, 136. https://doi.org/10.1016/j.autcon.2022.104169
Ekanayake, B., Wong, J. K.-W., Fini, A. A. F., & Smith, P. (2021). Computer vision-based interior construction progress monitoring: A literature review and future research directions. Automation in Construction, 127. https://doi.org/10.1016/j.autcon.2021.103705
Haist, M., Schack, T., Coenen, M., Vogel, C., Beyer, D., & Heipke, C. (2023). Concrete 4.0: Sustainable concrete construction with digital quality control. ce/papers, 6(6), 1555–1562. https://doi.org/10.1002/cepa.2965
Joshua, O., Olusola, K. O., Nduka, D. O., Ede, A. N., Olofinnade, O. M., & Job, O. F. (2020). Modified mix design development specification batched by volume from specified mix design by weight towards improved concrete production. MethodsX, 7. https://doi.org/10.1016/j.mex.2020.100817
Mejía-Aguilar, G., Gutiérrez-Prada, J. A., Portilla-Carreño, O. H., & Medina-Martínez, B. A. (2022). Evaluación de los retrasos en actividades de construcción utilizando redes Bayesianas: Caso de estudio. Entramado, 18(2). https://doi.org/10.18041/1900-3803/entramado.2.8006
Ministerio de Desarrollo Urbano y Vivienda. (2014). Norma Ecuatoriana de la Construcción NEC-SE-HM: Estructuras de hormigón armado.
Osorio-Gómez, C. C., Herrera, R., Pellicer, E., Alzate-Buitrago, A., & Aristizábal-Torres, D. (2023). Construction 4.0:Cluster analysis and research perspectives. Revista Ingeniería de Construcción, 38(3), 493–506.https://doi.org/10.7764/ric.00083.21
Pal, A., Lin, J. J., Hsieh, S.-H., & Golparvar-Fard, M. (2023). Automated vision-based construction progress monitoring in built environment through digital twin. Developments in the Built Environment, 16. https://doi.org/10.1016/j.dibe.2023.100247
Qureshi, A. H., Alaloul, W. S., Wing, W. K., Saad, S., Musarat, M. A., Ammad, S., & Kineber, A. F. (2023). Automated progress monitoring technological model for construction projects. Ain Shams Engineering Journal, 14(10). https://doi.org/10.1016/j.asej.2023.102165
Reja, V. K., Varghese, K., & Ha, Q. P. (2022). Computer vision-based construction progress monitoring. Automation in Construction, 138. https://doi.org/10.1016/j.autcon.2022.104245
Rivera, L., Baguec, H., Jr., & Yeom, C. (2020). A study on causes of delay in road construction projects across 25 developing countries. Infrastructures, 5(10). https://doi.org/10.3390/infrastructures5100084
Saldaña, C., Román, D., Castillo, T., Andrade, A., & Mora, C. (2025). Evaluación de calidad de especificaciones técnicas en obras civiles. Novasinergia, 8(1), 99–112. https://doi.org/10.37135/ns.01.15.03
Sarmento, M., & Ribeiro-Ferreira, M. L. (2021). Factors affecting construction productivity in Brazil: Comparison with recent international research. Revista Ingeniería de Construcción, 36(3), 369–379.
Tukundane, H., & Yang, Y. (2024). Effect of project control practices on the performance of building construction companies in Uganda: A case study of the City of Kampala. Buildings, 14(6). https://doi.org/10.3390/buildings14061818
Ukpata, J. O., Ogirigbo, O. R., & Black, L. (2023). Resistance of concretes to external chlorides in the presence and absence of sulphates: A review. Applied Sciences, 13(1). https://doi.org/10.3390/app13010182
Vassena, G. P. M., Perfetti, L., Comai, S., Mastrolembo-Ventura, S., & Ciribini, A. L. C. (2023). Construction progress monitoring through the integration of 4D BIM and SLAM-based mapping devices. Buildings, 13(10). https://doi.org/10.3390/buildings13102488
Xiao, B., Wang, Y., Zhang, Y., Chen, C., & Darko, A. (2024). Automated daily report generation from construction videos using ChatGPT and computer vision. Automation in Construction, 168.

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
